Bundesliga Match Attax 22/23 v3.3.0 APK + MOD (Unlimited Money / Gems)
Official Trading Card Game!
Updated on September 1, 2024
| Name | Bundesliga Match Attax 22/23 |
|---|---|
| Genre | Sports |
| Version | 3.3.0 |
| Developers | Topps Europe Limited |
| ID | com.topps.matchattax.bundesliga |
| Size | 77Mb |
| Request | 4.4 |
| Download | 100,000+ |
Features MOD APK of Bundesliga Match Attax 22/23
Download Bundesliga Match Attax 22/23 MOD APK with Unlimited Money / Gems.MENU MOD
- Unlimited Money.
- Unlimited Gems.
- Unlimited Diamonds.
- Unlocked Characters.
- High Dame.
- Onehit.
- God Mode.
Install Bundesliga Match Attax 22/23 MOD APK
To download Bundesliga Match Attax 22/23 (Unlimited Money / Gems) APK and other applications at ApkSoul.net you should see the instructions below.- You can download it by clicking the download button below the article. Then wait a few seconds for the system to automatically download the Bundesliga Match Attax 22/23 MOD APK / DATA file
- To install software anywhere else, you have to enable installation from third-party sources.
- Enable the "Unknown Sources" setting: Go to Menu > Settings > Security > and check for unknown sources so that your phone can install applications from sources other than the Google Play Store.
- Once you have completed the above step, you can go to the "Download" folder in the file manager and click on the downloaded MOD APK file.
After the installation is complete, you can open the application and experience as usual.
Note: Before installing the APK MOD, you need to uninstall the original version or another MOD version.
About Bundesliga Match Attax 22/23
• Match Attax is the official trading card game of the Bundesliga and Bundesliga 2!
• Scan codes found in every physical packet of Bundesliga Match Attax, these can be found in-stores and online!
• Purchase Topps coins to buy extra trades, new packets and incredible LIVE cards that are based on a player’s performance every week in the Bundesliga!
• Go head-to-head with other Match Attax collectors in our free weekly tournaments and earn exclusive Tournament King cards!
• Take on your friends and family with our Head-to-Head mode!
• Show off your tactical expertise as you progress through the Match Attax leagues, getting promotion and earning your stars before you reach the top!
• Claim FREE digital packets by earning XP as you play Match Attax against opponents online.
• With our super quick and easy trading system, get new cards you need EVERY day with free transfers!
• Fill your own personal Trophy Cabinet with our exciting in-app reward system!
• Smaller app size, same great quality!
• Look out for the Match Attax Masters – if you beat one, you will claim their title and your crest will be ON FIRE! Then go and compete with other collectors to keep your title!
• Available in English, Deutsch and 中文!
FOR PARENTS: Your child will play in a safe, closed environment, with no identifiable information presented, other than their chosen team name and there is no communication between users within the Match Attax App. The game is free to play through our free pack XP system; however, there will be prompts for your child to scan the codes from their physical packet of Bundesliga Match Attax to allow them to add to their digital collection. The App also includes in-app purchases of Topps coins that allow users to purchase packets and other in-app items.
The App, Privacy Policy, Terms and Conditions and other supporting documents are only available in English, Deutsch and 中文. Please only download the App if you are able to understand one of these languages.
For feedback and support, please email support@matchattax.com
® & © Topps. All Rights Reserved. Topps and Match Attax are registered trademarks of The Topps Company, Inc.
All club names, logos and designs, all player names and images as well as all Bundesliga and Bundesliga 2 names, logos, designs and trophies are the property, trademarks and/or copyright of the respective clubs/players/organisation and are used with the kind permission of the respective owners. Manufactured under license from the DFL Deutsche Fußball Liga e.V. in sole responsibility of Topps Europe Ltd.
What's new in version 3.3.0
Bundesliga Match Attax update alert!This fresh new update for the Bundesliga Match Attax App includes some cool new features, very important bug fixes and some general maintenance to improve the experience of the App.
Frequently Asked Questions (FAQ)
Q. How to download Bundesliga Match Attax 22/23 on ApkSoul.net?
To download Bundesliga Match Attax 22/23 Apk Mod, please click on the download button at the top of the article or at the end of this article. You will then find the Apk file on ApkSoul.net's “Download” page. Follow the necessary instructions and you will download Bundesliga Match Attax 22/23 MOD APK (Unlimited Money / Gems) for free.
The installation steps after downloading most game mod apk are the same. Open menu, settings, security and search for unknown sources so your phone can install apps from sources other than Google Play Store, ApkSoul.net. Go to the “Downloads” folder on your device and click on the downloaded file. Then install and launch it on your phone. Wait a moment for the device to install the game mod apk.
Q. Is it safe to download Bundesliga Match Attax 22/23 APK Mod (Unlimited Money / Gems) on ApkSoul.net?
When the user downloads the Apk file from ApkSoul.net, we will check the relevant APK file on Google Play and let the user download it directly. The games and applications uploaded to our website are safe and harmless to users.
Q. Why do you need permission to install Bundesliga Match Attax 22/23 Mod Hack (Unlimited Money / Gems) ?
The app needs access to the system on your device. When you install an application, you will be notified of all the permissions required to run the application.
Overview
Bundesliga Match Attax 22/23 (com.topps.matchattax.bundesliga) is a game mod apk on Android, download the latest version of Bundesliga Match Attax 22/23 Hack Mod (Unlimited Money / Gems) 2022 for Android. This game mod apk can be played for free and does not require root.
Bundesliga Match Attax 22/23 MOD APK (Unlimited Money / Gems) APK + OBB 2022 can be downloaded and installed on your android device with android version 4.1 or higher. Download this game mod apk using your favorite browser and click install to install the game mod apk. Downloading (com.topps.matchattax.bundesliga) APK + DATA of Bundesliga Match Attax 22/23 (Unlimited Money / Gems) from ApkSoul.net is easier and faster.
Reviews from users
P:
A:
D:
G:
Download Bundesliga Match Attax 22/23 MOD APK for Android
You may also like
free shopping
161 1,000,000+
Unlimited Money / Gems
1.5.2 51
Unlimited Money / Gems
1.93.1 10,000,000+
Rewards with out ads
1.1.2.178 500,000+
Unlimited Money / Gems
1.5.6 1,000,000+
Unlimited Money / Gems
2.0.0 3500
Unlocked
1.33 100,000+
Unlimited Money / Gems
1.0.0 50+
Unlimited Money / Gems
1.0.0 500+